Project Overview

Project Type: Bioenergy / Biogas Development

Feedstock: Organic waste (agricultural & agro-industrial)

Project Stage: Feasibility Study (FS)

Energy Output:

  • Biogas for power generation (CHP)
  • Optional upgrading to biomethane (CBG / pipeline quality gas)

Project Objective:

Convert organic waste into renewable energy while reducing emissions, improving waste management, and generating sustainable revenue.


Client Objectives

The project owner sought to:

  • Evaluate technical feasibility of biogas production
  • Assess technology options (digester type, gas utilization)
  • Determine CAPEX & OPEX viability
  • Identify operational and execution risks
  • Support investment and development decisions

Scope of Project Review

🔹 Feedstock & Supply Assessment

  • Quantity and consistency of organic waste
  • Seasonal variation and logistics
  • Feedstock pre-treatment requirements

🔹 Process & Technology Review

  • Anaerobic digestion technology selection
  • Biogas yield assumptions
  • Gas cleaning and upgrading requirements
  • Digestate handling and utilization

🔹 Energy Utilization Options

  • Biogas to CHP (electricity & heat)
  • Biogas upgrading to biomethane (CBG / grid injection)
  • Hybrid utilization strategies

🔹 Utilities & Integration

  • Electrical interconnection
  • Heat recovery utilization
  • Water and wastewater handling
  • Integration with existing facilities

🔹 Commercial & Financial Review

  • CAPEX estimation methodology
  • OPEX drivers (labor, maintenance, consumables)
  • Revenue streams (power, gas, by-products)
  • Sensitivity analysis

🔹 Risk & Sustainability Review

  • Feedstock supply risk
  • Process stability risk
  • Environmental and regulatory compliance
  • Long-term operational sustainability

Key Findings

  1. Feedstock availability was sufficient, but required structured logistics management.
  2. Biogas yield assumptions were optimistic and needed conservative adjustment.
  3. CHP utilization provided higher operational reliability than direct upgrading in early phases.
  4. Digestate management represented both a risk and an opportunity if properly utilized as organic fertilizer.
  5. Biomethane upgrading was technically feasible but economically sensitive to scale and market pricing.

Recommendations

  • Adopt a phased development approach (CHP first, biomethane later)
  • Apply conservative biogas yield and availability assumptions
  • Select digestion technology based on feedstock variability, not nameplate efficiency
  • Strengthen O&M planning from early project stages
  • Integrate sustainability and compliance planning into FEED

Outcome & Value Delivered

The project review enabled the client to:

  • Clarify technology and development strategy
  • Reduce execution and operational risk
  • Improve investment confidence
  • Align sustainability goals with commercial reality

The project proceeded to the next development phase with refined assumptions and a more robust execution plan.


Lessons Learned

  • Bioenergy projects are feedstock-driven, not technology-driven
  • Operational simplicity often delivers higher long-term value
  • Early-stage engineering discipline is critical for renewable projects
  • Sustainability must be economically viable to be truly sustainable

How This Applies to Your Bioenergy Project

Our bioenergy consulting approach is applicable to:

  • Biogas & biomethane projects
  • Waste-to-energy developments
  • Agricultural & agro-industrial waste utilization
  • Circular economy initiatives

Professional Engagement Notice

This case study is for illustration only.

Actual consulting services are delivered under a formal professional agreement, with defined scope, deliverables, and confidentiality.


Call to Action

👉 Planning a biogas or bioenergy project?

Let us support your project with independent review, feasibility analysis, and engineering advisory.

📩 Email: afakar@gmail.com

📱 WhatsApp: +62 813-6864-3249

No comments:

Other Articles

oclkaf03bnr1

at26914806

at26997598

Followers