Posts

Low Temperature Activated Carbon Plant: Detail Engineering Design (DED)

Image
πŸ“˜ DED – Part 1: General Plant Layout and Plot Plan 1.1 Plant Location and Site Consideration Site Area : Approx. 6,000 – 10,000 mΒ² (for 5,000 TPA); expandable to 18,000 mΒ² for 30,000 TPA. Preferred Location : Near coconut/palm plantation; proximity <10 km from raw material source. Topography : Flat to slightly sloped; elevation control required. Utilities Required : Water supply (bore well or industrial), Electricity (300–500 kW min), Drainage, Access road. 1.2 Plant Layout (Zone Division) Zone A – Raw Material Receiving and Crushing Zone B – Drying and Carbonization Area Zone C – Steam Activation and Cooling Area Zone D – Screening, Pulverizing, and Packing Zone E – Utilities: Boiler House, Genset Room, Compressor Area Zone F – Control Room, Laboratory, Admin Office, Workshop Zone G – Storage & Warehouse (Raw and Finished) 1.3 Plot Plan (Standard Distance Guidance) Facilit...